Ever wonder what it actually costs to build a data centre?
Our estimate: RM2.1 billion for a 50MW facility โ and thatโs before a single chip is installed.
Most of that goes into electrical systems (40โ45%) and cooling (15โ25%), with the building itself making up only 10โ15% (JLL / Turner & Townsend). Land isnโt included either โ a facility this size can need 10โ50 acres on top.
Then thereโs the hardware. A single Nvidia GB200 NVL72 rack costs around US$5.9 million, and a 50MW site needs roughly 400 of them. That second bill can be bigger than the building itself.
And because AI-grade racks run so hot, liquid cooling โ which costs 35โ40% more than air cooling โ is now the only real option.
The takeaway: RM2.1B is just one piece of a much bigger price tag.