09/04/2026
Welcome back, Cal Poly Maritime students!
Facilities teams were busy over the summer refreshing student housing, gathering spaces and campus grounds for the year ahead.
In student housing, teams refreshed 648 room and bathroom spaces, completed more than 450 patch-and-paint projects, repaired or replaced more than 420 pieces of furniture and installed more than 500 new blinds.
Students will also find new water bottle filling stations on the first floor of Lower Residence Halls A, B and C, along with updates to study and gathering spaces, including refreshed whiteboard walls, new carpet and new paint and furniture.
Outside, landscaping was refreshed around the waterfront palm trees, Maritime North, the campus entry and hillside areas.
Swipe through to see some of the improvements, and thank you to the Facilities team and everyone who helped get campus ready to welcome students back!