06/04/2026
6 weeks of digging, 110 ft under the building. About 30 ft outside to connect the broken 'Y' at the 6in main. Fixing broken lines, reconnecting where the pipe had to be lowered to flow correctly and dealing with the rain. Part of the 4in was IN the concrete beam, had to get chipped out.
4 MEN working 8 to 10 hour days, 6 days a week, a 1.7ton excavator to help remove dirt and dig in the yard for 6 weeks total!!
I think we are done.🥱🤤🥴🥵