Westicke Properties

Directions Website Contact the business

Westicke Properties Real Estate Investment and Development

✨ Just a little rot repair and foundation work on this early 1900s beauty in Lake Worth🔨 New floors, paint, fixtures and...
10/10/2026

✨ Just a little rot repair and foundation work on this early 1900s beauty in Lake Worth

🔨 New floors, paint, fixtures and updated built ins make this gem move in ready!

🏡 Check back in a few days when this 3 bed 2 bath craftsman hits the market!

Hey Fort Worth, Look what’s coming to Panther Island.
10/05/2026

Hey Fort Worth, Look what’s coming to Panther Island.

A new step for downtown flood protection.💧

The U.S. Army Corps of Engineers has awarded the construction contract for the North Bypass Channel. The channel will help move floodwater around the downtown bend of the Trinity River, reducing flood risk in central Fort Worth.

This rendering shows what the channel could look like, including pedestrian paths and connections to Trinity Trails. Initial construction work is expected to begin in late winter or early spring 2027, with the channel expected to be complete in 2029.

Want to see the plans and ask questions? Stop by the come-and-go open house Thursday, Oct. 22, from 6 to 7:30 p.m. at Northside Community Center, 1100 N.W. 18th St.

Read the full story: https://cfw.pub/3VaWisL

✨ Whoooo, just a few last little details left before this beauty hits AirBnB 🙌🏼 🏡 So excited to offer our first of a doz...
09/18/2026

✨ Whoooo, just a few last little details left before this beauty hits AirBnB 🙌🏼

🏡 So excited to offer our first of a dozen storybook cottages being built in in Marble Falls

📆 Check back in a day or two for the listing, to see the inside of this charming cottage and book your stay!




06/28/2026

🌊 Before Lake Travis. Before Lake LBJ. Before the chain of six Highland Lakes that today make the Colorado River one of the most managed and most recreational waterways in Texas — the Colorado was one of the most dangerous rivers in America, a chronically flood-prone waterway that devastated the communities along its banks with a reliability that made living near it a calculated risk that Central Texans accepted because the bottomland soil was so extraordinarily productive and the water itself so essential in a semi-arid landscape. 🤠 The floods of 1900, 1915, 1935, and 1938 each caused catastrophic damage to communities from the Hill Country to the Gulf Coast, each one killing people and destroying property and generating promises of federal action that moved too slowly to prevent the next disaster.
The Lower Colorado River Authority was established in 1934 specifically to bring order to the Colorado River — to build the dams and the reservoirs and the hydroelectric facilities that would simultaneously control the flooding that plagued the river's communities and generate the electrical power that the region needed for its economic development. The Highland Lakes dam system that the LCRA built between 1937 and 1951 — Buchanan, Inks, LBJ, Marble Falls, Travis, and Austin — transformed the Colorado from a periodic catastrophe into a managed resource, creating the chain of lakes that defines the Hill Country landscape today and that Central Texans now use primarily for recreation without necessarily connecting their weekend boating to the flood control engineering that made their lakeside experience possible. 😢 The communities along the lower Colorado — Bay City, Columbus, Wharton — still flood in extreme rainfall events, a reminder that the river's essential character has been managed but not eliminated.
Did you know that the Highland Lakes of the Texas Hill Country were built primarily as flood control infrastructure — and that the lake system that Central Texans now treasure for its beauty and its recreation was created in direct response to the Colorado River floods that killed people and destroyed communities for the first four decades of the twentieth century? Drop your Highland Lakes memory or your Colorado River history in the comments and follow along for more hyper-realistic windows into the Texas engineering history that transformed a dangerous river into a beloved landscape. 👇✨

Maturing loan volume is up slightly month over month, increasing from 199 to 205.The 12-month outlook on the amount comi...
06/23/2026

Maturing loan volume is up slightly month over month, increasing from 199 to 205.

The 12-month outlook on the amount coming due is down significantly from $3.9B in April to $900M in May.

Distressed assets remain stable at 34 properties, down one from the previous month.

Transaction volume declined month over month, with 63 transactions in April compared with 34 in May.

The highest transaction value increased to $90M, up from $81M in April.

Data: Clint Yoder, Stewart Title

06/22/2026

Water supply planning continues to be one of the most important long-term issues facing communities across Central Texas, including Burnet. While we are in a much better position than most cities, residents should be aware that several future changes could affect water conservation rules, long-term water costs, and how cities plan for future growth.

One change that may occur in the next couple of years involves outdoor watering. LCRA has indicated that future rules may limit yard watering to no more than once per week. While this type of rule would help conserve water and protect the Highland Lakes system during dry conditions, it could also reduce overall water consumption. That is good from a conservation standpoint, but it can also affect water utility revenues, since the cost to operate and maintain the water system does not decrease at the same rate as water usage. Over time, that kind of reduction could place pressure on future water rates.

Residents should also be aware that the cost of raw water from LCRA may increase in the future. One major issue involves debt related to the LCRA Arbuckle Reservoir, which was constructed downstream. That debt is currently expected to be included in LCRA water rates around 2035. If that occurs as currently planned, it could result in a significant increase in the cost of water for cities and other firm water customers. It is possible that LCRA may continue to look for ways to delay or reduce that impact, but there is no guarantee.

The year 2035 is also important for Burnet because that is when the City’s current water contract expires. Under future contract terms, the City will be required to pay a reservation fee on contracted water it does not use. Burnet currently has 4,000 acre-feet under contract but uses approximately 1,000 acre-feet annually, meaning the City could be required to pay 50% of the cost of the remaining 3,000 acre-feet simply to preserve access to that water for future growth and long-term reliability.

These long-term uncertainties are one reason the City has remained focused on maintaining groundwater supplies in addition to the surface water we purchase from LCRA. Having multiple water sources strengthens the reliability of Burnet’s overall water system and reduces our dependence on any single source. It is also why the City remains committed to expanding its groundwater capacity, including efforts to bring the Valley Street Well back online.

The bottom line is that there is nothing residents need to do differently today beyond continuing to use water wisely and following current watering rules. However, water supply and water cost issues are expected to become more important over the next nine to ten years. The City will continue to monitor these discussions closely, maintain and expand our groundwater capabilities, and advocate for approaches that protect Burnet’s long-term water supply while also considering the financial impact on our residents.

Address

705 First Street, Suite 204
Marble Falls, TX
78654

Alerts

Be the first to know and let us send you an email when Westicke Properties posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Westicke Properties:

Shortcuts

Share