06/24/2026
Changes in scope, schedule, and budget are among the leading drivers of professional liability claims on design and construction projects. The American Society of Civil Engineers breaks down what design professionals need to know to reduce their exposure.
When the engineer determines there is a change to the scope, schedule, and/or fee, then an amendment is required to the agreement to implement the change.