07/09/2026
π¨ WE'RE HIRING! π¨
Tina Hydropower Limited is recruiting for two roles on the 15 MW Tina River Hydropower Project in Garivera, Central Guadalcanal:
β‘ Electrical Engineer β Assistant
ποΈ Civil Engineer β Assistant
Application Closing Date: 18 September 2026 at 5:00 PM
π© To Apply:
Email your Cover Letter + CV to [email protected]
(Civil applicants, please CC: [email protected]).
π Enquiries: Mr Derwin Ovita (+677 25115)
βΉοΈ For more info, visit our website: https://tina-hydro.com/current-jobs/
Preference given to Bahomea & Malango applicants and Solomon Islands nationals.