🚧 PUBLIC NOTICE: ROAD CONSTRUCTION – Mendana Avenue (Seaside Section) 🚧
The Ministry of Infrastructure Development (MID), under the Land and Maritime Connectivity Project (LMCP), would like to inform the public and valued stakeholders that construction works along the seaside section of Mendana Avenue will commence on Monday, 23rd June 2025.
✅ This follows the near completion of works along the bush side (from BSP/HP Roundabout to Town Ground Roundabout), which is expected to be finished by the end of this week.
📍 Work Area:
Seaside of Mendana Avenue – from BSP/HP Roundabout to Town Ground Roundabout
🗓️ Start Date:
Monday, 23rd June 2025
⏳ Duration:
Approximately 2 months (in two phases)
🛠️ Scope of Work:
1. Stormwater pipe laying and drainage pit construction
2. Removal of existing asphalt pavement
3. Excavation, sub-grade preparation, and backfilling
4. Prime coat application
5. Asphalt concreting
6. Footpath, walkway, bus bay, and parking construction
7. Completion of median curbstone
🔄 Phased Construction and Traffic Arrangement:
• Phase 1 (Month 1):
Road closure from BSP/HP Building to Coconut Cafe Road.
🔁 Remaining section open to traffic.
• Phase 2 (Month 2):
Road closure from Coconut Cafe Road to Town Ground Roundabout.
🔁 Previously closed section reopened.
⚠️ What to Expect:
• Temporary road closures and diversions
• Heavy machinery operation (e.g., excavators, rollers, trucks)
• Increased noise and vehicle activity
• Restricted access to certain roadside areas
The project team will implement appropriate traffic management and safety measures to minimize inconvenience to motorists, pedestrians, and nearby businesses.
📞 Contact Us:
If you have questions, concerns, or need more information, please contact:
🔹Dorothy Wickham – Comms LMCP
📱 7496421
🔹 Mr. David Gange – CCECC Safeguards Specialist/EHS Manager
📱 737-6307 | 📧 [email protected]
🔹 Mr. Stanley Mamanu – Community Liaison Officer (CLO)
📱 779-8907
We sincerely apologize for any inconvenience and thank you for your patience and cooperation as we work to improve our roads and infrastructure.