http://www.iemsa-egy.com/ I.E.M.S.A. was founded by Dr. Vittorio Montanari
in Buenos Aires in 1948. In 1980 Dr. V.

IEMSA was founded in Milan in 1964. The shareholding
was split between Dr. V. Montanari (50%) and
Dr. De Nora (50%). Montanari took over the 50% of Dr. De Nora
The main activity of IEMSA S.p.A. was mechanical erection. Considering of the substantial reduction of investment level in Italy during early 90’s, in 1994 it was decided to form I.E.M.S.A in order to upgrade I.E.M.S.A. activities by enteri

ng into the contracting business. Shareholder of I.E.M.S.A is 100% APRILFER S.r.l. (100% Montanari family). Mercury cells
Chorine cells
Diaphram cells
Nichel and titanium alloy products
I.E.M.S.A core business is to manage and perform main contracting projects of medium sizes (about 30.000.000= USD) as well as traditional electromechanical erection activities. Its long experience in the construction of various type of plants (power stations, chemical and petrochemical plants, etc.) makes it also capable to supply an engineering service in order to solve problems related to the maintenance and rebuilding of old plants. I.E.M.S.A is also the owner of a mechanical fabrication workshops total area
6030 square meters (more than 300 ton/month) of plate work and steel structure.

We are proud to announce the successful completion of the “Ebda’” project in the city of Gamasa, delivered in full compl...
27/08/2025

We are proud to announce the successful completion of the “Ebda’” project in the city of Gamasa, delivered in full compliance with the highest technical and quality standards.
All phases of the project have been executed efficiently and on schedule, reflecting the professionalism of the engineering team and the strength of collaborative efforts throughout.
We extend our sincere appreciation to all stakeholders and partners for their valuable support, and we look forward to seeing this project contribute meaningfully to sustainable development in the region.
Mr. Mohamed Ali
Site Manager

Ebda a new tanks project in gamsa
11/02/2025

Ebda a new tanks project in gamsa

Preparing to lift the new part of the chimney of Boiler 2 using an 800 ton crane  Birla carbon Egypt
11/02/2025

Preparing to lift the new part of the chimney of Boiler 2 using an 800 ton crane Birla carbon Egypt

The rest of the steel building parts boiler chimney 1 Birla carbon Egypt
11/02/2025

The rest of the steel building parts boiler chimney 1 Birla carbon Egypt

Preparing to install the new part of the boiler chimney 2 Birla carbon Egypt
11/02/2025

Preparing to install the new part of the boiler chimney 2 Birla carbon Egypt

Removing the corroded part of the boiler chimney 2  Birla carbon Egypt
11/02/2025

Removing the corroded part of the boiler chimney 2 Birla carbon Egypt

Er****on new steel structure for stack boiler 1 Birla carbon egypt
11/02/2025

Er****on new steel structure for stack boiler 1 Birla carbon egypt

11/02/2025
24/11/2022

I.E.M.S.A CONSTRUCTION | 141 من المتابعين على LinkedIn. I.E.M.S.A S.p.A. WAS MECHANICAL ER****ON | - l.E.M.S.A. was founded by Dr. Vittorio Montanari in Buenos Aires in 1948.

Our work in el nouran suger project. - new salhia er****on  extraction tower 33m ..
05/04/2017

Our work in el nouran suger project. - new salhia er****on extraction tower 33m ..

Indirizzo

Via Nizza N. 46
Rome
00198

Orario di apertura

Lunedì 09:00 - 17:00
Martedì 09:00 - 17:00
Mercoledì 09:00 - 17:00
Giovedì 09:00 - 17:00
Sabato 09:00 - 17:00
Domenica 09:00 - 17:00

Notifiche

Lasciando la tua email puoi essere il primo a sapere quando IEMSA Construction pubblica notizie e promozioni. Il tuo indirizzo email non verrà utilizzato per nessun altro scopo e potrai annullare l'iscrizione in qualsiasi momento.

Contatta L'azienda

Invia un messaggio a IEMSA Construction:

Condividi