18/10/2022
A long overdue post on our most recent renovation project for N8 homes .
We finished this lovely flat 6 weeks ago. A real race to the finish, calls to and fro from Schiphol airport and the final touches only completed as I landed in Cape Town π©.
We put some real creativity into this project maximising space in the bedroom with a custom-built wardrobe, adding a handy drawer below the oven in the kitchen, and the lovely feature wall in the living room π₯.
Really grateful for the teamwork and attention to detail by the team on this one. Special thanks to RK Home Improvements for going above and beyond πβ.
This property was tenanted within 5 days of completion at Β£575pcm π.
The professional photos below were only taken a week after completion. Thanks as always to Mahan-Photography!