06/03/2026
Viscount Completes First Phase of 2026 Silver Cliff Drill Program and Identifies Important Geological Corridor Linking the Kate and Passiflora Areas
Final holes intersect strong phyllic alteration, increasing sulphide intensity, visible galena and localized massive sulphide mineralization; assays pending
Viscount Mining Corp. ("Viscount" or the "Company") (TSX VENTURE: VML) (OTCQX: VLMGF) is pleased to announce completion of the first phase of the core drill campaign at the Silver Cliff Project in Colorado, where the final four drill holes (K26-05 through K26-08) encountered widespread hydrothermal alteration, brecciation, manganese-oxide mineralization, strong sulphide mineralization with increasing intensity, visible galena and localized massive sulphide veining north of the Kate Resource area. The Company believes these results support its interpretation that the mineralized hydrothermal system at Silver Cliff extends beyond the current Kate Silver resource area and northward toward the Passiflora porphyry target and the Ben West volcanic complex, potentially indicating proximity to a larger mineralized system.
To read full release: https://docsconsultingltd.com/2026/06/03/viscount-completes-first-phase-of-2026-silver-cliff-drill-program-and-identifies-important-geological-corridor-linking-the-kate-and-passiflora-areas/
Contact: Craig Doctor
1+604-278-4656
[email protected]
www.docsconsultingltd.com