Solar project done 21 kw  mashALLAH.Total solar project 80 kw for Ccr building.
04/11/2020

Solar project done 21 kw mashALLAH.

Total solar project 80 kw for Ccr building.

12/06/2020

Jitna Pakistan ka Karza hai.
Utne ka to shayed ab Pakistan b ni Raha.

20/10/2019
22/05/2019

What is the formation mechanism of “Snowman”,
“Rhino horn”, and
“Boulder” in kiln system?

The first two deposits are formed from small clinker nodules and clinker dust particles. Their chemical and mineralogical composition is identical to clinker, but in some cases enrichment up to 3.5% K20 and 3.0% S03 has been noticed.

Snowman:
Is a formation of large build-up on cooler first grate (static grate) or kiln discharge wall where the clinker falls from the kiln. Snowman may eventually grow to reach the mouth of the kiln, thereby blocking the discharge of clinker from the kiln. Snowman causes poor clinker distribution thereby poor heat exchange between clinker and secondary air. Snowman formation mechanism may divide to two:

1). Freezes of the clinker liquid phase as the clinker passes through the first cooling zone in the rotary kiln or on falling down the chute into the grate cooler. The clinker dust particles carried back by the secondary air stream from the clinker bed grate into the interior of the rotary kiln also play an important role on formation snowmen. The clinker dust particles, having a superficial liquid phase layer, strike against the chute wall and the refractory lining at discharge side of the rotary kiln, lose their kinetic energy and the superficial liquid phase freezes immediately.

2). Occasionally large lumps of coating discharge from the kiln, these lumps of kiln coating act as “seeds” for the formation of snowmen. Snowmen form when fines fall from the kiln above, onto the top surfaces of these lumps on top of the clinker bed within the cooler. As layer after layer of the fines fuse onto the lump, snowmen “grow” upwardly into stalagmite-like structures.

Rhino horn:
is a build-up on the top of kiln burner pipe.

Rhino horn formation mechanism: Clinker dust carried back to the kiln with the secondary combustion air loses velocity around the burner and that causes clinker dust to settle and build up on the top of the burner.

Boulder:
Generally, clinker ball/ boulder formation is related to low clinker SM with high AM or related to very thick coating.

Boulder formation mechanism: Large clinker balls initiate and grow behind a thick coating or ring. Build up often fall and slide into the kiln as large slabs and coming to rest behind a ring (if it is large enough). The slab can roll around behind the ring forming a ball which can then grow larger due to accretion.

Best Industry
03/05/2019

Best Industry

Construction work of WHR
15/11/2018

Construction work of WHR

S.P and AQC Boiler
08/11/2018

S.P and AQC Boiler

Project: WHR. Installation of boiler work.
27/10/2018

Project: WHR. Installation of boiler work.

14/09/2018

Pakistan: Thatta Cement’s standalone sales fell by 22% US$23.1m in the financial year to 30 June 2018 from US$29.7m in the same period in 2017. Its gross profit fell by 35% to US$6.1m from US$9.4m. Its profit for the year fell by 39% to US$2.9m from US$4.7m.