Warehouse Corporate Park

Warehouse Corporate Park Leasing of Industrial Warehouse Spaces WCP provides the following infrastructures, facilities, and services to its Clientele. meter.

The Park consists of 50,476 square meter classified as industrial land Composed of four clusters, averaging about 7,000 - 9,000 square meter subdivided into 1,120/960/600 sq. Electricity supplied by the Manila Electric Company (MERALCO). Water from deep wells dug within the Park is piped to central storage tanks with a capacity of 30,000 gallons for domestic use. Water is distributed from there to

each cluster. Centralized water system for fire protection and backup. PLDT & Digitel lines available. Flood Free guarantee, Your business and your investment is safe from typhoons, and flooding. CCTV Surveillance Camera at the main gate entrance and exit.

No flooding in Sta Rosa and Biñan warehouses. Just the way it should be. Protect your investments. 👍
22/07/2025

No flooding in Sta Rosa and Biñan warehouses. Just the way it should be. Protect your investments. 👍

Construction updates 2.1.24. Finished with the foundations. Colvert drainge being installed.
01/02/2024

Construction updates 2.1.24. Finished with the foundations. Colvert drainge being installed.

Groundbreaking ceremony 9.20.23. Watch out for our second warehouse site in binan, laguna
20/09/2023

Groundbreaking ceremony 9.20.23. Watch out for our second warehouse site in binan, laguna

02/09/2021

We are currently in the middle of rooftop renovations. Old roof has rusted and is in need of replacements of new panels and insulation

20/08/2019

Currently we are fully occupied. Will post again if there will be any vacancies in the near future

Construction updates 6.8.19. We are fully rented out for phase 2. Backlog in installaton of i.t. services. Finishing tou...
08/06/2019

Construction updates 6.8.19. We are fully rented out for phase 2. Backlog in installaton of i.t. services. Finishing touches on last three warehouse spaces. Minor roadworks issues and stp system is slowly being setup. 4 vaccancies available with phase 1 warehouses. We are still accepting tenants. =) @ Warehouse Corporate Park

Almost done.. a few finishing touches and we are good to go. IT team to go in for cctv camera installation. Still waitin...
05/04/2019

Almost done.. a few finishing touches and we are good to go. IT team to go in for cctv camera installation. Still waiting for Laguna water to finish their job. Tenants have already started moving in and there is still no water supply. Thank you in advance for your prompt cooperation. We also need the water supply for s.t.p. testing.

Address

Malitlit Road, Barangay Malitlit
Sta. Rosa Laguna
4026

Alerts

Be the first to know and let us send you an email when Warehouse Corporate Park posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share