08/02/2017
Happy folks! We’re happy to share another milestone of the Kuala Lumpur-Singapore High Speed Rail ( ), with the appointment of AECOM Singapore Pte Ltd to conduct the Advanced Engineering Study (AES) for the project.
The AES will include architectural, civil, electrical, mechanical and other design services for the HSR infrastructure within Singapore, i.e. the Jurong East terminus, tunnels, and the bridge across the Straits of Johor.
Selected through a highly competitive tender process, AECOM has extensive experience in international HSR projects, such as planning and design of the Beijing South HSR Station in China, the High Speed 2 railway in the United Kingdom, and the West Kowloon Terminus for the Express Rail Link in Hong Kong.
Locally, AECOM has worked with LTA to design the Circle Line, Downtown Line, Thomson-East Coast Line, and the Tuas West Extension.
Stay tuned for more updates on the KL-SG HSR!