18/08/2026
Element Residence, structure work update.
Block C has reached its third floor, targeting the fourth by next week. Block D is on its second floor, moving to the third. Both blocks are on track to complete their main structure by September, with architectural work beginning next week. The amenity area's lower and upper deck structure is targeted for completion in October.
Real progress, block by block.
DM us for details.