Senekis LTD Electrical Switchboards

Senekis LTD Electrical Switchboards Designing and Construction of electrical systems for Medium Voltage, Low Voltage, Automation, Outdoor Substation kiosk, Photovoltaic Applications...

14/09/2026

🔎 𝐀 𝐜𝐚𝐛𝐥𝐞 𝐦𝐚𝐫𝐤𝐢𝐧𝐠 𝐨𝐧𝐥𝐲 𝐝𝐨𝐞𝐬 𝐢𝐭𝐬 𝐣𝐨𝐛 𝐢𝐟 𝐢𝐭 𝐫𝐞𝐦𝐚𝐢𝐧𝐬 𝐥𝐞𝐠𝐢𝐛𝐥𝐞.

One of the most common questions we receive concerns the durability of printed cable markings. At Senekis, we answer it with a practical test.

Following the verification method described in IEC 61439-1, the marking is rubbed for 15 seconds with water and then for another 15 seconds with hexane.

To pass the test, the print must show no significant deterioration, while the information displayed must remain clear and easily legible.

𝐓𝐞𝐬𝐭𝐞𝐝 𝐢𝐧 𝐩𝐫𝐚𝐜𝐭𝐢𝐜𝐞. 𝐕𝐞𝐫𝐢𝐟𝐢𝐞𝐝 𝐛𝐲 𝐭𝐡𝐞 𝐫𝐞𝐬𝐮𝐥𝐭.

🔐 𝐂𝐲𝐛𝐞𝐫 𝐫𝐞𝐬𝐢𝐥𝐢𝐞𝐧𝐜𝐞 𝐢𝐬 𝐛𝐞𝐜𝐨𝐦𝐢𝐧𝐠 𝐩𝐚𝐫𝐭 𝐨𝐟 𝐢𝐧𝐝𝐮𝐬𝐭𝐫𝐢𝐚𝐥 𝐞𝐧𝐠𝐢𝐧𝐞𝐞𝐫𝐢𝐧𝐠.From 11 September 2026, the reporting obligations under Ar...
11/09/2026

🔐 𝐂𝐲𝐛𝐞𝐫 𝐫𝐞𝐬𝐢𝐥𝐢𝐞𝐧𝐜𝐞 𝐢𝐬 𝐛𝐞𝐜𝐨𝐦𝐢𝐧𝐠 𝐩𝐚𝐫𝐭 𝐨𝐟 𝐢𝐧𝐝𝐮𝐬𝐭𝐫𝐢𝐚𝐥 𝐞𝐧𝐠𝐢𝐧𝐞𝐞𝐫𝐢𝐧𝐠.

From 11 September 2026, the reporting obligations under Article 14 of the EU Cyber Resilience Act begin to apply.

Manufacturers whose products with digital elements fall within the Regulation’s scope must report actively exploited vulnerabilities and severe incidents affecting product security, with an early warning within 24 hours and a full notification within 72 hours.

For industrial automation, this regulatory milestone highlights a broader engineering priority: cybersecurity should be considered from the design stage, not added after a system is complete.

Across PLC, HMI and SCADA environments, secure architectures, controlled access, network segmentation, update management and lifecycle support all contribute to stronger operational resilience.

𝐀𝐬 𝐢𝐧𝐝𝐮𝐬𝐭𝐫𝐢𝐚𝐥 𝐬𝐲𝐬𝐭𝐞𝐦𝐬 𝐛𝐞𝐜𝐨𝐦𝐞 𝐦𝐨𝐫𝐞 𝐜𝐨𝐧𝐧𝐞𝐜𝐭𝐞𝐝, 𝐬𝐞𝐜𝐮𝐫𝐞-𝐛𝐲-𝐝𝐞𝐬𝐢𝐠𝐧 𝐛𝐞𝐜𝐨𝐦𝐞𝐬 𝐩𝐚𝐫𝐭 𝐨𝐟 𝐫𝐞𝐥𝐢𝐚𝐛𝐥𝐞 𝐢𝐧𝐝𝐮𝐬𝐭𝐫𝐢𝐚𝐥 𝐞𝐧𝐠𝐢𝐧𝐞𝐞𝐫𝐢𝐧𝐠.

♻️ 𝐏𝐨𝐰𝐞𝐫𝐢𝐧𝐠 𝐬𝐦𝐚𝐫𝐭𝐞𝐫 𝐫𝐞𝐜𝐲𝐜𝐥𝐢𝐧𝐠.Senekis designed and manufactured a series of compact LV distribution panels for recycling...
09/09/2026

♻️ 𝐏𝐨𝐰𝐞𝐫𝐢𝐧𝐠 𝐬𝐦𝐚𝐫𝐭𝐞𝐫 𝐫𝐞𝐜𝐲𝐜𝐥𝐢𝐧𝐠.

Senekis designed and manufactured a series of compact LV distribution panels for recycling kiosks serving a major supermarket chain.

Tailored to the requirements of the application, the panels provide organized electrical distribution and support the safe and reliable operation of the equipment at each recycling point.

𝐄𝐯𝐞𝐧 𝐭𝐡𝐞 𝐦𝐨𝐬𝐭 𝐜𝐨𝐦𝐩𝐚𝐜𝐭 𝐚𝐩𝐩𝐥𝐢𝐜𝐚𝐭𝐢𝐨𝐧 𝐫𝐞𝐪𝐮𝐢𝐫𝐞𝐬 𝐰𝐞𝐥𝐥-𝐞𝐧𝐠𝐢𝐧𝐞𝐞𝐫𝐞𝐝 𝐞𝐥𝐞𝐜𝐭𝐫𝐢𝐜𝐚𝐥 𝐢𝐧𝐟𝐫𝐚𝐬𝐭𝐫𝐮𝐜𝐭𝐮𝐫𝐞.

🎓 Η 𝐒𝐞𝐧𝐞𝐤𝐢𝐬 στις Ημέρες Καριέρας της ΔΥΠΑ στη Θεσσαλονίκη, την Παρασκευή 11 και το Σάββατο 12 Σεπτεμβρίου 2026.📍 Αποθήκη...
07/09/2026

🎓 Η 𝐒𝐞𝐧𝐞𝐤𝐢𝐬 στις Ημέρες Καριέρας της ΔΥΠΑ στη Θεσσαλονίκη, την Παρασκευή 11 και το Σάββατο 12 Σεπτεμβρίου 2026.

📍 Αποθήκη Γ’, Λιμάνι Θεσσαλονίκης, Α’ προβλήτα, ΟΛΘ
🕙 𝟏𝟎:𝟎𝟎 - 𝟏𝟖:𝟎𝟎

Αν σε ενδιαφέρει να γνωρίσεις από κοντά τη Senekis, να μάθεις περισσότερα για το εργασιακό μας περιβάλλον και να συζητήσουμε ευκαιρίες επαγγελματικής εξέλιξης στον χώρο της ηλεκτρολογίας, της μηχανικής και των ενεργειακών υποδομών, θα χαρούμε να σε συναντήσουμε εκεί.

🤝 Ελάτε να γνωριστούμε από κοντά.

Η συμμετοχή είναι δωρεάν για όλους τους ενδιαφερόμενους.
🔗 Δήλωση συμμετοχής: https://tinyurl.com/j4swj6zu

#ΗμέρεςΚαριέρας #ΔΥΠΑ #Θεσσαλονίκη

🌱 𝐓𝐡𝐞 𝐧𝐞𝐱𝐭 𝐠𝐞𝐧𝐞𝐫𝐚𝐭𝐢𝐨𝐧 𝐢𝐬 𝐚𝐥𝐫𝐞𝐚𝐝𝐲 𝐡𝐞𝐫𝐞The average age of the 𝐒𝐞𝐧𝐞𝐤𝐢𝐬 team has steadily decreased, from 𝟒𝟑.𝟒 years in 2024...
04/09/2026

🌱 𝐓𝐡𝐞 𝐧𝐞𝐱𝐭 𝐠𝐞𝐧𝐞𝐫𝐚𝐭𝐢𝐨𝐧 𝐢𝐬 𝐚𝐥𝐫𝐞𝐚𝐝𝐲 𝐡𝐞𝐫𝐞

The average age of the 𝐒𝐞𝐧𝐞𝐤𝐢𝐬 team has steadily decreased, from 𝟒𝟑.𝟒 years in 2024 to 𝟒𝟎.𝟖 in 2025 and 𝟑𝟖.𝟗 as of 30 June 2026.
This 𝟒.𝟓-𝐲𝐞𝐚𝐫 𝐜𝐡𝐚𝐧𝐠𝐞 highlights the growing presence of a new generation of professionals within our team.

New talent brings fresh perspectives, new skills and the energy to keep moving forward. Working alongside experienced colleagues, younger team members gain practical knowledge through real projects, shared responsibility and everyday collaboration.

This balance between new ideas and proven expertise strengthens our capabilities and ensures that valuable know-how continues to evolve.

𝐀 𝐲𝐨𝐮𝐧𝐠𝐞𝐫 𝐭𝐞𝐚𝐦. 𝐀 𝐬𝐭𝐫𝐨𝐧𝐠𝐞𝐫 𝐟𝐮𝐭𝐮𝐫𝐞.

🍂 𝐀𝐮𝐭𝐮𝐦𝐧 𝐛𝐞𝐠𝐢𝐧𝐬. 𝐏𝐫𝐨𝐠𝐫𝐞𝐬𝐬 𝐜𝐨𝐧𝐭𝐢𝐧𝐮𝐞𝐬.September marks the start of a new season and a renewed focus on the projects, partn...
01/09/2026

🍂 𝐀𝐮𝐭𝐮𝐦𝐧 𝐛𝐞𝐠𝐢𝐧𝐬. 𝐏𝐫𝐨𝐠𝐫𝐞𝐬𝐬 𝐜𝐨𝐧𝐭𝐢𝐧𝐮𝐞𝐬.

September marks the start of a new season and a renewed focus on the projects, partnerships, and engineering challenges ahead.

At Senekis, we move into autumn with the same commitment to engineering excellence, precision, and reliable electrical solutions.

𝐇𝐞𝐥𝐥𝐨, 𝐒𝐞𝐩𝐭𝐞𝐦𝐛𝐞𝐫. 𝐇𝐞𝐫𝐞’𝐬 𝐭𝐨 𝐚 𝐩𝐫𝐨𝐝𝐮𝐜𝐭𝐢𝐯𝐞 𝐦𝐨𝐧𝐭𝐡! ⚡

31/08/2026

☀️ 𝐖𝐡𝐞𝐫𝐞𝐯𝐞𝐫 𝐬𝐮𝐦𝐦𝐞𝐫 𝐭𝐨𝐨𝐤 𝐮𝐬, 𝐒𝐞𝐧𝐞𝐤𝐢𝐬 𝐜𝐚𝐦𝐞 𝐚𝐥𝐨𝐧𝐠.

From seaside escapes and family adventures to moments of rest and fun, the people of Senekis shared snapshots from destinations across Greece, taking a little piece of the company with them along the way.

As the season comes to a close, we look back on these memories and return with renewed energy for everything ahead.

𝐃𝐢𝐟𝐟𝐞𝐫𝐞𝐧𝐭 𝐝𝐞𝐬𝐭𝐢𝐧𝐚𝐭𝐢𝐨𝐧𝐬. 𝐎𝐧𝐞 𝐒𝐞𝐧𝐞𝐤𝐢𝐬 𝐭𝐞𝐚𝐦.

⚡ 𝐖𝐚𝐥𝐥-𝐦𝐨𝐮𝐧𝐭𝐞𝐝 𝐨𝐫 𝐟𝐥𝐨𝐨𝐫-𝐬𝐭𝐚𝐧𝐝𝐢𝐧𝐠?Choosing the right Low Voltage switchboard depends on the available space, the scale of...
28/08/2026

⚡ 𝐖𝐚𝐥𝐥-𝐦𝐨𝐮𝐧𝐭𝐞𝐝 𝐨𝐫 𝐟𝐥𝐨𝐨𝐫-𝐬𝐭𝐚𝐧𝐝𝐢𝐧𝐠?

Choosing the right Low Voltage switchboard depends on the available space, the scale of the installation and the specific requirements of each project.

𝐖𝐚𝐥𝐥-𝐦𝐨𝐮𝐧𝐭𝐞𝐝 solutions are suitable for compact installations where floor space is limited. 𝐅𝐥𝐨𝐨𝐫-𝐬𝐭𝐚𝐧𝐝𝐢𝐧𝐠 switchboards offer greater internal capacity for larger equipment layouts, complex cabling and future expansion.

Installation conditions, accessibility, maintenance needs and protection against dust, moisture and mechanical impact should also be considered.

At 𝐒𝐞𝐧𝐞𝐤𝐢𝐬, both configurations are manufactured and verified according to 𝐄𝐍 𝟔𝟏𝟒𝟑𝟗-𝟏 & 𝟐, ensuring safe and reliable power distribution.

26/08/2026

🚛 𝐑𝐞𝐚𝐝𝐲 𝐟𝐨𝐫 𝐝𝐞𝐩𝐚𝐫𝐭𝐮𝐫𝐞

Another key stage for the 𝐌𝐲𝐤𝐨𝐧𝐨𝐬 𝐏𝐕 𝐏𝐫𝐨𝐣𝐞𝐜𝐭 𝟑𝟓 𝐌𝐖𝐩 in Domokos, Greece.

This reel captures the careful loading of the 𝐊𝐈𝐎𝐒𝐊 at the Senekis facilities, prepared for safe transportation to 𝐊𝐨𝐮𝐤𝐨𝐬, one of the project’s four sub-projects, with a capacity of 8.5 MW.

From design and construction to loading and dispatch, every stage requires precision, coordination and careful planning.

𝐁𝐮𝐢𝐥𝐭 𝐰𝐢𝐭𝐡 𝐩𝐫𝐞𝐜𝐢𝐬𝐢𝐨𝐧. 𝐓𝐫𝐚𝐧𝐬𝐩𝐨𝐫𝐭𝐞𝐝 𝐰𝐢𝐭𝐡 𝐜𝐚𝐫𝐞.

🔍 𝐅𝐫𝐨𝐦 𝐅𝐨𝐫𝐦 𝟏 𝐭𝐨 𝐅𝐨𝐫𝐦 𝟒𝐛: 𝐖𝐡𝐲 𝐢𝐧𝐭𝐞𝐫𝐧𝐚𝐥 𝐬𝐞𝐩𝐚𝐫𝐚𝐭𝐢𝐨𝐧 𝐦𝐚𝐭𝐭𝐞𝐫𝐬This retro photo takes us back 𝟐𝟓 𝐲𝐞𝐚𝐫𝐬, reflecting Senekis’ lo...
24/08/2026

🔍 𝐅𝐫𝐨𝐦 𝐅𝐨𝐫𝐦 𝟏 𝐭𝐨 𝐅𝐨𝐫𝐦 𝟒𝐛: 𝐖𝐡𝐲 𝐢𝐧𝐭𝐞𝐫𝐧𝐚𝐥 𝐬𝐞𝐩𝐚𝐫𝐚𝐭𝐢𝐨𝐧 𝐦𝐚𝐭𝐭𝐞𝐫𝐬

This retro photo takes us back 𝟐𝟓 𝐲𝐞𝐚𝐫𝐬, reflecting Senekis’ long-standing experience in the design and construction of low-voltage switchboards.

While technologies have evolved, internal separation remains essential for safety, accessibility and controlled maintenance.

In simplified terms, the progression is:
🔹 𝐅𝐨𝐫𝐦 𝟏: No internal separation.
🔹 𝐅𝐨𝐫𝐦 𝟐: Busbars are separated from functional units.
🔹 𝐅𝐨𝐫𝐦 𝟑: Functional units are also separated from one another.
🔹 𝐅𝐨𝐫𝐦 𝟒𝐛: Busbars, functional units and external terminals are separated, with the terminals located outside the compartment of their associated functional unit.

This structured compartmentalisation supports safer access, limits contact with adjacent live parts and makes inspection and maintenance more controlled.
At 𝐒𝐞𝐧𝐞𝐤𝐢𝐬, we manufacture certified Low Voltage switchboards from 𝐅𝐨𝐫𝐦 𝟏 𝐭𝐨 𝐅𝐨𝐫𝐦 𝟒𝐛, selecting the appropriate configuration according to the technical and operational requirements of each project.

𝐓𝐡𝐞 𝐫𝐢𝐠𝐡𝐭 𝐟𝐨𝐫𝐦 𝐦𝐞𝐚𝐧𝐬 𝐭𝐡𝐞 𝐫𝐢𝐠𝐡𝐭 𝐥𝐞𝐯𝐞𝐥 𝐨𝐟 𝐬𝐞𝐩𝐚𝐫𝐚𝐭𝐢𝐨𝐧 𝐟𝐨𝐫 𝐭𝐡𝐞 𝐚𝐩𝐩𝐥𝐢𝐜𝐚𝐭𝐢𝐨𝐧.

Address

ΟΤ 43 ΔΑ-11 ΒΙΠΕΘ ΣΙΝΔΟΣ
Θεσσαλονικη
57022

Opening Hours

Monday 09:00 - 16:30
Tuesday 08:00 - 16:30
Wednesday 08:00 - 16:30
Thursday 08:00 - 16:30
Friday 08:00 - 16:30

Telephone

+302310797024

Website

,https://www.senekis.gr/en/assets/pdf/senekis-espa-en.pdf

Alerts

Be the first to know and let us send you an email when Senekis LTD Electrical Switchboards posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share