Data Centres | Cyxtera | Slough
Arcforce have completed multiple Data Centre projects including this project focused on enhancing water systems and drainage infrastructure to improve overall efficiency, reliability, and long-term performance without disrupting ongoing operations.
Working within a tightly controlled environment and programme, our team installed 12” carbon steel welded pipework, prefabricated off-site to ensure precision, quality, and efficiency.
Delivering within a live data centre required meticulous planning and coordination. A phased installation approach, combined with strict safety protocols and close collaboration with onsite teams, ensured all critical systems remained fully operational throughout.
Quality was paramount. The installation underwent rigorous inspection processes, including non-destructive testing and pressure testing, to guarantee system integrity and performance.
The project was completed on time and to the highest standards, resulting in a significant improvement to the facility’s operational efficiency and resilience.
A great example of what can be achieved through careful planning, technical expertise, and strong teamwork in a high-risk, live environment.