JML Contracts Ltd JML Contracts Ltd is an established, family run construction company which specialises in building w The way we are building houses is changing.

JML Contracts Ltd is based in Perthshire, Central Scotland and specialises in the SIPs (Structural Insulated Panels) building method. With environmental issues likely to dominate all our lives for the foreseeable future, the building industry is moving to adapt new technologies which will lead to the building of a brand new type of environmentally friendly and energy-efficient housing. Structural Insulated Panels (SIPS) are at the forefront of this radical change in building design and technology. SIPS are one of the most ecologically friendly materials on the market and with their unique insulating properties they dramatically reduce heating bills and significantly increase living spaces within the build. SIPS technology is regarded by many influential figures in UK construction as the future of the industry in the UK and sometime soon all houses will be built like this. JML Contracts Ltd is one of the only companies in Scotland with their own in-house SIP engineers, designers, installation team and SIP processing factory. We can offer a unique fully bespoke SIP design and build service for our clients.

Our Redi-Rock walling project at Isla Road, Perth is making good progress. The installation is moving along well and the...
15/10/2026

Our Redi-Rock walling project at Isla Road, Perth is making good progress. The installation is moving along well and the wall is really starting to take shape.

JML Contracts began a series of gabion mattress repairs this week at Whiteadder Reservoir for valued client George Lesli...
13/10/2026

JML Contracts began a series of gabion mattress repairs this week at Whiteadder Reservoir for valued client George Leslie. The team have made good progress during the first week, with the weather providing some welcome assistance.

Domestic gabion seating and retaining works in Burntisland this week for a private client. The site presented some chall...
12/10/2026

Domestic gabion seating and retaining works in Burntisland this week for a private client. The site presented some challenging access, but the right equipment, planning and experience helped the team get the work moving.

Work is getting underway at Harvey Wynd for Stirling Council on a new precast retaining wall. The initial works involve ...
09/10/2026

Work is getting underway at Harvey Wynd for Stirling Council on a new precast retaining wall. The initial works involve rock breaking and site preparation, before the precast units are craned into position.

Our Rockbag banking protection project on the Annick Water is gathering pace. Designed and installed by JML, the works a...
08/10/2026

Our Rockbag banking protection project on the Annick Water is gathering pace. Designed and installed by JML, the works are progressing well as the team continues with the stabilisation and protection of the river bank.

Preparations are underway for the installation of a Redi-Rock retaining wall designed by JML. The team are getting the s...
07/10/2026

Preparations are underway for the installation of a Redi-Rock retaining wall designed by JML. The team are getting the site ready before the wall installation begins.

Logierait Bridge deck refurbishment is now complete. We’re delighted to have played our part in this community project a...
06/10/2026

Logierait Bridge deck refurbishment is now complete. We’re delighted to have played our part in this community project and to see the works successfully completed.

A look back at some of the projects the team has been working on this month. From bridge works and gabion installations ...
30/09/2026

A look back at some of the projects the team has been working on this month. From bridge works and gabion installations to Rockbags and much more, it’s been another busy month covering a diverse range of civil engineering and construction projects across Scotland.

The long-reach excavators have been hard at work in Dreghorn this week as the team continues with riverbank repair and p...
29/09/2026

The long-reach excavators have been hard at work in Dreghorn this week as the team continues with riverbank repair and protection works on the Annick Water. Specialist plant is playing an important role in carrying out the works safely and efficiently along the riverbank.

Riverbank repair works continue in Dreghorn for JML Contracts, with the team making steady progress on site. The works f...
28/09/2026

Riverbank repair works continue in Dreghorn for JML Contracts, with the team making steady progress on site. The works form part of the wider riverbank protection scheme on the Annick Water, helping to strengthen and protect the riverbank for the future.